2025 NEWS
February 6, 2025: Inauguration of work in Olesa de Montserrat
The Minister of Territory, Housing, and Ecological Transition visited the construction site in Olesa de Montserrat and our factory in Massanes.
January 2025: Assembly of the first apartments at the Olesa Development
On Tuesday, January 28, the assembly of the first 4 floors began. The assembly lasted 3 days with the installation of 12 modules that make up 4 floors of 48m2, their roof, and the first 2 sections of the staircase.
See more
2024 NEWS
September 2024: Manufacturing of the first prototypes
We are starting the first prototypes of housing under the commission of the SALAS Foundation for 28 units of subsidized rental housing. A project that represents a significant step in our goal of providing efficient and high-quality housing solutions.
See more
July 2024: Inauguration of Massanes factory
We begin our dream, the challenge of industrialized housing manufacturing with prefabricated modules in a sustainable way, with quality, and optimizing costs. A true advancement in construction innovation.